| Sign In | Join Free | My benadorassociates.com |
|
Model Number : MFS1500A
Certification : UL,VDE,KC,PSE,cUL,CQC
MOQ : 1000 Pieces
Price : 0.016 ~ 0.02 USD/Pieces
Payment Terms : T/T,Paypal
Supply Ability : 10KKPCS Per Month
Delivery Time : 5-7 Days
Packaging Details : Tape 20000PCS/Carton (Default) ; Bulk ,10000PCS/Carton
Name : Miniature Fuse 5A 250V
Speed : Fast-acting
Rated Current : 5A
Voltage : 250V
Color : Black(Default)/Red
Size : 8x4x8mm
Shape : Rectangular
Breaking Capacity : Low
IEC Designation : IEC 127-3
I2T : 78 A2.S
PCB Mount Circuit Protection Compact Design Long Leaded PVC Cap Fast Acting Micro Miniature Fuse F 5A 250V
What is a Micro Fuse?
A micro fuse is a radial leaded subminiature fuse, offered in either a cylindrical or rectangular form factor. Micro fuses were originally designed for the U.S. Space Program. The micro fuse is made with either glass, plastic or metal bodies. They are designed to be electrically equivalent to miniature glass cartridge, fuses in a smaller package with higher tolerance to impact and vibration. Micro fuses can plug, in to a PC board mounted fuse holder. Micro fuse voltage, ratings typically range from 65 volts AC to 300 volts AC. Micro fuses with voltage ratings up to 450 volts DC are also available. Micro fuses are offered in fast acting, or time lag, versions. Micro fuses are typically built in accordance with UL 248-14, and CSA C22.2/No.248.14 or IEC 60127-3, standards. Some fuse micro series are also offered in MIL Spec, versions.

Scope of application
This product is suitable for various kinds of electronic devices’ circuit over current protection. Widely used in industrial of Battery Charges, Consumer Electronics, Power supplies, Industrial Controllers, etc.
Standards
In accordance with IEC60127-1, IEC60127-3 Standard sheet4, GB9364.1-1997, GB9364.3-1997.
Agency Approvals
| Agency | Ampere Range | Agency File Number |
| UR | 50mA ~ 6.3A | E340427(JDYX2) |
| C-UR | 50mA ~ 6.3A | E340427(JDYX8) |
| VDE | 50mA ~ 6.3A | 40039420 |
| CQC | 50mA ~ 6.3A | CQC16012154495 |
| PSE | 50mA ~ 6.3A | PSE16021073 |
| KC | 50mA ~ 6.3A | SU05052-16004/16005/16006 |
Specification
| P/N | Rated current | Rated voltage | Max. Voltage Drop (mv) | I2TMelting Integral(A2.S) |
| MFS0200A | 200mA | 250V | 1700 | 0.04 |
| MFS0250A | 250mA | 250V | 1400 | 0.06 |
| MFS0315A | 315mA | 250V | 1300 | 0.1 |
| MFS0400A | 400mA | 250V | 1200 | 0.2 |
| MFS0500A | 500mA | 250V | 1100 | 0.35 |
| MFS0630A | 630mA | 250V | 650 | 0.5 |
| MFS0800A | 800mA | 250V | 240 | 1.3 |
| MFS1100A | 1A | 250V | 200 | 1.6 |
| MFS1125A | 1.25A | 250V | 200 | 2.4 |
| MFS1160A | 1.6A | 250V | 190 | 4.6 |
| MFS1200A | 2A | 250V | 170 | 7.9 |
| MFS1250A | 2.5A | 250V | 170 | 12 |
| MFS1315A | 3.15A | 250V | 150 | 22 |
| MFS1400A | 4A | 250V | 130 | 29 |
| MFS1500A | 5A | 250V | 130 | 78 |
| MFS1630A | 6.3A | 250V | 130 | 97 |
| MFS1800A | 8A | 250V | 100 | 290 |
| MFS2100A | 10A | 250V | 100 | 430 |
Dimension (mm)

Materials
| NO. | Part Name | Material |
| 1 | Cap | Black or Brown Thermoplastic Polyamide PA 6.6, UL 94 V-0 |
| 2 | Base | Black or Brown Thermoplastic Polyamide PA 6.6, UL 94 V-0 |
| 3 | Fuse element | Alloy |
| 4 | Lead wire | Copper, Tin-plated |
Melting Time
| % of Ampere Rating(In) | Melting Time |
| 150%* In | 60 min Minimum |
| 210%* In | 30 min Max |
| 275%* In | 10 ms~3 s |
| 400%* In | 3 ms~300 ms |
| 1000%* In | 20 ms Max |
Microfuse PCB Mount Holder
![]() |
![]() |
|
|
Long Leaded PVC Cap Fast Acting Micro Miniature Fuse F 5A 250V PCB Mount Circuit Protection Images |